Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Construction
  5. ›WATER STREET PARK BULKHEAD REPAIRS

Awarded contract·City of Wilmington·North Carolina

WATER STREET PARK BULKHEAD REPAIRS

$250kSingle Award
Contract source

Description

This solicitation seeks a single‑prime contractor to repair approximately 500 linear feet of the bulkhead wall at Water Street Park, Wilmington, NC. The work includes corrosion removal, steel hole repairs, removal and disposal of creosote‑treated pilings and girders, recoating of sheet piles with coal‑tar epoxy, asphalt pavement patching, removal of marine “camel” bumpers, and back‑filling with rip‑rap and #57 stone. Bidders must hold a North Carolina Chapter 87 contractor license, provide a 5 % bid bond, and demonstrate a good‑faith effort to subcontract at least 14 % of the contract value to minority‑ or disadvantaged‑owned businesses. A pre‑bid conference is scheduled for October 3 2024, and proposals are due by October 31 2024. • Required licensed contractor (NC Chapter 87) – single‑prime only. • Scope covers steel bulkhead repair, creosote pile removal, epoxy coating, asphalt patching, and stone back‑fill. • 5 % bid bond, 90‑day guarantee, and MBE/DBE subcontracting goal of 14 % are mandatory.

Attached files

Key dates

Bids closed
10/31/2024
Contract modified
10/28/2024

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
WSPBH-SE-1024

Contract value

$250,000

No contract value is disclosed. Based on the scope – 500 ft of bulkhead steel repair (≈ $300 / ft = $150,000), removal of 57 creosote piles and 540 LF of girders (estimated $30,000), epoxy coating of sheet piles (≈ $10,000), asphalt patching of 4,750 SF at $8 / SF ($38,000), rip‑rap back‑fill of 80 CY at $100 / CY ($8,000), and miscellaneous labor and equipment (~$20,000), the total project cost is roughly $250,000. This estimate assumes typical regional labor rates and material costs for Wilmington, NC, and includes a modest contingency.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Melbourne·Florida

Top match · 68%

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

James City County·Virginia

67% match

Chickahominy Riverfront Park Pool

Closes 11/9/2026Opened 10/9/2026

New York City Department of Parks & Recreation·New York

67% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

City of Goose Creek·South Carolina

66% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026

New York City Department of Environmental Protection·New York

66% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Riverside·California

66% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Neptune Beach·Florida

66% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City of Manassas Park·Virginia

65% match

Reconstruction of Public Works Maintenance Yard

Closes 12/9/2026Opened 10/30/2026

City of Charlotte·North Carolina

65% match

Robert L. Smith Park Pond Surface Water Quality Improvement Project

Rolling / TBD closeOpened 5/29/2026

U.S. Department Of Defense·Pennsylvania

65% match

BULKHEAD

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·Pennsylvania

65% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/11/2026

City of Holly Grove·Arkansas

65% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

U.S. Department Of The Interior·Colorado

65% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

City of Vista·California

65% match

Wave Waterpark Restroom Remodel Project

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·Pennsylvania

65% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

Massachusetts Port Authority (Massport)·Massachusetts

65% match

MP2700-C1, EAST BOSTON PARKS REPAIRS TERM CONTRACT, EAST BOSTON, MASSACHUSETTS

Closes 11/4/2026Opened 10/14/2026

City of Ontario·California

65% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Charlotte·North Carolina

65% match

Elevated Water Tank Rehabilitation

Rolling / TBD closeOpened 1/12/2027

North Carolina City of Asheville·North Carolina

64% match

Water Line Repair for Wood Ave and Misc. Insulation Replacement

Closes 11/5/2026Opened 10/1/2026

Miami-Dade County·Florida

64% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

East Bay Municipal Utility District·California

64% match

FMC733-26-02 Stott Reservoir Joint Sealant Removal and Replacement

Closes 11/24/2026Opened 10/27/2026

City of Newport News·Virginia

64% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/9/2026Opened 10/8/2026

Georgia City of College Park·Georgia

64% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

Sewerage and Water Board of New Orleans·Louisiana

64% match

Drainage Point Repairs

Closes 11/13/2026Opened 10/20/2026

Massachusetts Port Authority - Capital Programs·Massachusetts

64% match

East Boston Parks Repairs Term Contract (MP2700‑C1)

Closes 11/4/2026Opened 10/14/2026