The contract is for the PWC - SC-HL Lattice Tower Upgrade project, which includes structural upgrades to Tower SC-HL 0/2. The project involves cleaning and scraping oxidation, replacing nuts and bolts, and installing galvanic cathodic protection. The engineer's estimate for the project is $343,000.00. The contract was awarded to Osmose Utilities Services, Inc.
• The project includes structural upgrades to Tower SC-HL 0/2
• The project involves cleaning and scraping oxidation, replacing nuts and bolts, and installing galvanic cathodic protection
• The engineer's estimate for the project is $343,000.00
• The contract was awarded to Osmose Utilities Services, Inc.