This contract is for lead abatement work at 453 Wooster Rd. in Barberton, Ohio. The work includes removing existing windows, making repairs as needed, and installing new white vinyl windows with a minimum of 5/8" insulated airspace and screens. The contractor must follow all applicable local building codes and regulations, including OSHA and EPA guidelines. The contract also requires the contractor to provide warranties for certain items, such as furnaces and hot water tanks. The estimated cost of the project is $12,200, and bids over 10% of this estimate may not be considered. The contract must be completed within 30 days of signing. Key aspects of the contract include:
• Lead abatement work
• Window removal and replacement
• Compliance with local building codes and regulations
• Provision of warranties for certain items
• Completion of the project within 30 days of signing
• Estimated cost of $12,200