This contract is for the 2021 Capital Improvement - 32nd St. SE Highway 9 Crossing Water Main Project (Re-Bid) in Snohomish County, Washington. The project involves installing approximately 214 lineal feet of 10” DR 9 high density polyethylene (HDPE) water main in a directionally bored 16” DR 17 high density polyethylene (HDPE) casing, as well as approximately 25 lineal feet of Class 52 8” Ductile Iron (D.I.) water main. The primary purpose of the project is to increase the capacity of the water system infrastructure and replace two portions of the existing water main crossing that are comprised of Asbestos Cement. The contract was awarded to B & L Utility, Inc. for a total of $224,638.80. Some key points about this contract include:
• The project location is on and in the vicinity of 32nd St. SE and Highway 9, near the City of Lake Stevens, in Snohomish County, Washington.
• The project includes TESC and surface restoration.
• Construction shall be performed while maintaining service to the existing water system.
• The contract was awarded through a competitive bidding process, with multiple vendors submitting bids.
• The contract is subject to the terms and conditions outlined in the RFP document.