The Montana Department of Transportation (MDT) is seeking bids to conduct soil excavation at the former MDT Swan Lake Facility. The project involves excavating shallow impacted subsurface soils, managing a one-time landfarm, reinstalling a monitoring well, and conducting groundwater monitoring. The contractor will be required to follow the Scope of Work (SOW) provided by MDT, which includes preliminary activities, excavation activities, landfarm activities, and post-excitation groundwater monitoring. The contract also requires the contractor to comply with various regulations, including those related to environmental protection and worker safety.
• The project requires the excavation of soil contaminated with petroleum products.
• The contractor must manage a one-time landfarm to treat the contaminated soil.
• The contractor must reinstall a monitoring well that was destroyed during excavation activities.
• The contractor must conduct groundwater monitoring to ensure that the contamination has been mitigated.
• The contractor must comply with all applicable federal, state, and local laws and regulations.
• The contractor must provide proof of authority to bind the company to the contract.
• The contractor must not withdraw the bid after it has been submitted.