This contract concerns the repair and refurbishment of the elevated concrete walkway (Level 2) at Chesapeake Hall on Salisbury University’s main campus. The work includes structural concrete surface repairs (2‑inch depth, priced per square foot), stair‑enlargement construction, removal and replacement of deteriorated masonry, application of a Sikalastic 726 pedestrian coating system (or approved alternative), steel surface preparation and coating with Macropoxy 646, installation of new metal counter‑flashing, drainage improvements, and limited railing and down‑spout work. The contractor must attend a mandatory site visit on 1 April 2026, submit separate technical and price proposals by 22 April 2026, and achieve substantial completion between 29 June 2026 and 18 August 2026, with final acceptance expected by September 2026. The university requires a minimum 4 % MBE participation but does not impose bonding, prevailing‑wage, or small‑business set‑aside restrictions.
• Concrete repair – 2‑in. depth, unit‑price per sf
• Specialty coating – Sikalastic 726 (or approved alternate) and steel coating
• Stair enlargement, metal flashing, drainage & limited railing work
• Mandatory site visit, 4 % MBE participation, no bond required