The 2025 Sewer Main Replacement Program is a public works construction project aimed at replacing approximately 2,500 linear feet of sewer pipeline. The project involves upsizing existing 5” vitrified clay pipes to 6” PVC pipes and replacing existing 8” vitrified clay pipes with 8” PVC pipes. The project also includes repaving three city alleys with concrete and constructing new driveway aprons. The contract has a duration of 100 working days and is funded with local funds. Key aspects of the project include:
• Replacement of sewer pipelines
• Upsizing of existing pipes
• Repaving of city alleys
• Construction of new driveway aprons
• Funding from local sources
• Duration of 100 working days