This contract concerns the design‑build of an overflow parking lot at the Yakima Air Terminal (AP2503). The scope includes demolition of existing pavement, extensive earthwork, storm‑water infrastructure installation, base‑course placement, concrete curb & gutter, paving, lighting, signage, landscaping, and associated testing and documentation. The bid tabulation lists 40 line‑item categories with unit‑price details and a total bid value of roughly $680 k after additive schedules for illumination and LED reader board. Four pre‑qualified contractors submitted proposals, but the award decision is not included in the provided excerpt.
• Full demolition, excavation, and base‑course installation for a new overflow parking area.
• Installation of storm‑water utilities (catch basin, PVC pipe) and concrete curb & gutter.
• Provision of lighting, LED reader board, signage, landscaping, and safety devices (bollards, parking bumpers).