The contract is for the Roxbury Street Flood Improvements project, which involves replacing a 36" brick drain, water and sewer mains, resurfacing asphalt roadway, and installing curb and sidewalk in selected areas. The engineer's estimate for the project is $1,860,000.00. The contract was awarded to multiple vendors, with the lowest bid totaling $1,753,410.00. The project includes various items such as removal of fire hydrants, excavation, vibration monitoring services, and installation of hot bituminous pavement. The contract also includes a pre-bid conference and a bid submission deadline.
• The project requires the replacement of a 36" brick drain and water and sewer mains.
• The project involves resurfacing asphalt roadway and installing curb and sidewalk in selected areas.
• The engineer's estimate for the project is $1,860,000.00.
• The contract was awarded to multiple vendors, with the lowest bid totaling $1,753,410.00.
• The project includes various items such as removal of fire hydrants, excavation, vibration monitoring services, and installation of hot bituminous pavement.