The Nevada County Purchasing Agent is accepting sealed bids for the replacement of the existing maple floor in the Grass Valley Veterans Hall all-purpose gym with new maple flooring. The scope of work includes but is not limited to the following: Replace the existing maple floor in the Grass Valley Veterans Hall all-purpose gym with new maple flooring, including but not limited to #1 grade MFMA (Maple Flooring Manufacturers Association) maple flooring, sanding, finishing, base shoe and court lines. The contract has an engineer's estimate of $160,000. The bid opening date was March 31, 2021, at 2:30 p.m. Some key points to note are:
* The project requires a California Contractor’s C-15 (Flooring) license.
* The project requires proof of being a member in good standing with the MFMA.
* The project requires a minimum of ten (10) years’ experience installing gymnasium wood floors.
* The project requires an established business in the Sacramento region with a minimum of five (5) references to be submitted with the bid.
Some of the key benefits of this contract include:
* The opportunity to work on a high-profile project in the Grass Valley Veterans Hall.
* The chance to demonstrate expertise in gymnasium wood floor installation.
* The potential for future work with Nevada County.
However, there are also some challenges to consider:
* The project requires strict adherence to the plans and specifications.
* The project requires compliance with the MFMA standards.
* The project requires coordination with the County's Facilities Management department.