This municipal contract awards Scout Lake Construction, Inc. the responsibility for a comprehensive roadway and utility improvement project in Selah, Washington, administered by the City of Yakima. The scope encompasses extensive site preparation, grading, excavation, installation of storm‑sewer and water‑line infrastructure, paving, curb and gutter work, sidewalk construction, traffic‑control features, lighting, fencing, and ancillary environmental measures. The award was made on August 4 2016 following competitive bids opened on August 3 2016, with a total bid value of roughly $795 k for the primary and optional alternate scopes.
• Primary work: clearing/grubbing, grading, bio‑filtration swale, erosion control, and asphalt paving.
• Utility installation: 12‑in. storm‑sewer pipe, water‑line ductile‑iron pipe, hydrants, valves, plus an optional sanitary‑sewer alternate.
• Ancillary items: concrete curbs, sidewalks, chain‑link fencing, illumination system, and signage.