The City of Worcester is awarding a sealed‑bid contract for the “Indian Lake Parkway Twin Manhole Separation” project (Contract S26‑1, Bid 8725‑M6). The scope includes roughly 3,400 linear feet of new sanitary and surface sewer mains, installation of 37 new manholes and reconstruction of 5 existing ones, placement of 9 new catch basins and reconstruction of 14 existing ones, abandonment of 54 pipe sections, and about 65 linear feet of new water main with associated appurtenances. The work also covers site‑clearing, trenching, de‑watering, shoring, traffic control, environmental protection, and required testing (including television pipe inspection). The contract is a sealed‑bid, lowest‑responsible‑bid award, with a 5 % bid security requirement and a 250‑day time‑for‑completion schedule. GVC Construction, Inc. is the awardee.