The Floresta Drive Improvement Project Phase 2 involves the construction of a two-lane section with landscaped median and a two-lane section with a bi-directional turn lane, including sidewalks, bike lanes, curb and gutter, landscape, irrigation, water and sewer adjustments, and pedestrian lighting. The project also includes a bridge replacement and removal of an existing pedestrian bridge. The contract was initially awarded to Felix Associates of Florida, Inc. but was later assigned to Felix Civil Construction, LLC. The contract duration is approximately 976 days, from August 1, 2022, to March 29, 2025. Key aspects of the project include:
• Construction of a two-lane section with landscaped median and a two-lane section with a bi-directional turn lane
• Inclusion of sidewalks, bike lanes, curb and gutter, landscape, irrigation, water and sewer adjustments, and pedestrian lighting
• Bridge replacement and removal of an existing pedestrian bridge
• Assignment of the contract from Felix Associates of Florida, Inc. to Felix Civil Construction, LLC
• Contract duration of approximately 976 days