This contract is for the design and installation of an above ceiling solution to access the mechanical and electrical equipment in the auditorium at Topeka High School. The project involves a base bid and several alternate bids, including the addition of a fire-rated ceiling and the replacement of stage curtains and floor. The contract was awarded to Senne & Company, Inc. for a total amount of $740,596.00. The scope of work includes the installation of the above ceiling solution, as well as any necessary engineering and design services.
• The project is a design-build project, using the AIAA133 Standard Form of Agreement Between Owner and Construction Manager.
• The contract includes a $25,000.00 allowance for unforeseen conditions.
• The bidder is required to submit a lump sum bid for the base bid and each alternate bid.
• The contract was awarded based on the lowest responsive bid.