The South Robbinsdale Drainage Projects contract involves the replacement and repair of drainage facilities in three locations: E Centennial St - Elm to Michigan, E Nebraska St Inlet, and Michigan Ave Concrete Channel Repair. The contract was awarded to R.C.S. Construction, Inc. and Site Works Specialists, Inc. with a base bid of $201,837.04 and $223,678.10, respectively. The project is estimated to cost around $172,000.00 to $194,834.10. The scope of work includes drainage facility replacement and repair.
• The project locations are in Rapid City, South Dakota.
• The contract was bid on by two vendors.
• The engineer's estimate for the project is $172,000.00.
• The base bids for the two vendors are $201,837.04 and $223,678.10.