This contract represents an emergency water‑main repair performed for Santa Fe County after a pipe burst on December 25 2025 at 7 Honeysuckle Circle, disrupting water service to ten homes. The county invoked NM emergency procurement authority (§ 131‑127) and awarded the work to TLC Construction Services without competition. The scope covered locating the break, excavating, replacing the damaged 24‑inch pipe segment, and associated equipment, material, and labor costs. The county processed an invoice on February 3 2026 for $36,828.84 (including tax) with payment due March 1 2026.
• Emergency sole‑source award under NM statutes, bypassing standard competitive procedures.
• Scope limited to rapid water‑main repair (labor, equipment, material, subcontractor and rental costs plus 10 % O&P).
• Total contract value approximately $37 k, paid via check to Spear D Construction and a Payzer online portal.