The City of Palm Bay is seeking bids for the Cogan Drive Roadway & Drainage Improvement project. The project includes pipe replacements, full depth reclamation, asphalt paving, and striping along Cogan Drive SE, a 2-lane collector road approximately 2 miles long. The project also includes the installation of new pipes and headwalls, backfilling, compaction, and restoration in accordance with the plans. Several companies have bid on the project, including Community Asphalt, CMA LLC, and Derrico Construction Corp. The bid submission date was November 17, 2009, and the bid posting date was October 15, 2009.
• The project includes pipe replacements, full depth reclamation, asphalt paving, and striping along Cogan Drive SE.
• The project is approximately 2 miles long.
• Several companies have bid on the project.
• The bid submission date was November 17, 2009.
• The bid posting date was October 15, 2009.