This contract is a design‑build procurement for the remodel of the front‑counter area of Building 4 at Santee City Hall. The City of Santee will pay a lump‑sum amount for a full suite of services, from architectural and engineering design through demolition, construction, finishing, and warranty. The work includes casework, furnishings, electrical, data, low‑voltage, ceiling and duct‑wrap upgrades, concrete‑step improvements, and protection of existing landscape irrigation utilities. The contractor must obtain all permits, comply with California building, fire, electrical, mechanical, labor‑code, prevailing‑wage, CARB, and storm‑water regulations, and provide a two‑year warranty. The project schedule is 100 working days after the Notice to Proceed (approximately September 1 2026 to late January 2027).
• Scope covers complete design, permitting, demolition, construction, and finish‑out of the front‑counter interior.
• Budgeted at $240 K (award $413,738) on a lump‑sum basis, with performance and payment bonds required.
• Strict compliance with prevailing‑wage, safety, drug‑free workplace, and environmental requirements is mandated.