This contract is for lead abatement at 721 Columbus Ave. Akron, Ohio 44306. The work includes removing existing windows, making repairs, and installing new windows. The contractor must follow all applicable local building codes and regulations, including OSHA and EPA RRP. The contract requires the contractor to provide a $2,000,000 general commercial liability insurance and $1,000,000 commercial auto liability insurance. The contract also requires the contractor to provide a Davis Bacon prevailing wage. The contract is expected to be finished within 30 days of signing.
• The contract includes the replacement of interior doors and windows.
• The contractor must follow all applicable local building codes and regulations.
• The contract requires the contractor to provide a $2,000,000 general commercial liability insurance and $1,000,000 commercial auto liability insurance.
• The contract also requires the contractor to provide a Davis Bacon prevailing wage.
• The contract is expected to be finished within 30 days of signing.