The contract is for the Lake Link Trail - Phase 1 project, which involves the construction of a trail from Scranton Rd. to Columbus Rd. The project requires a final set of complied drawings and specifications, and the design process is anticipated to be highly interactive. The contract was bid on by several vendors, with the top bidders being Great Lakes Const., Latten, Buddie Platform, Independence Excavatine, Chirmer Const, and Huffman Equip. The bid tabulation form shows the base bid prices and additional costs for each vendor.
• The project requires a final set of complied drawings and specifications.
• The design process is anticipated to be highly interactive.
• The contract was bid on by several vendors.
• The top bidders are Great Lakes Const., Latten, Buddie Platform, Independence Excavatine, Chirmer Const, and Huffman Equip.
• The bid tabulation form shows the base bid prices and additional costs for each vendor.