The contract is for the construction of the 103rd Street Pump Station Chemical Feed System, which includes site work, precast concrete building and footings, ballasted underground fiberglass storage tank, twin day storage tanks, associated piping, chemical transfer pump, chemical feed dosing pumps, conduit, wiring, controls, and all other appurtenances. The project is located near the intersection of 103rd Street and Cedar Creek Parkway in northwest Olathe, Kansas. The bid opening was on June 27, 2013, at 10:00 am. The engineer's estimate for the project is not explicitly stated, but the bid amounts from the vendors range from $240,000.00 to $359,322.00.
• The project requires a satisfactory bid bond executed by the bidder or an acceptable surety, in an amount equal to five percent (5%) of the total bid for work.
• The successful bidder will be required to furnish and pay satisfactory performance and payment bond or bonds.
• The City of Olathe, Kansas, reserves the right to reject any or all bids or to waive any informality in the bidding.
• Bidders that wish to inspect the project site are required to call Randy Mather, Wastewater Collection Program Manager, at 913-971-9054.
• Bid documents including drawings and specifications are on file at the office of Public Works of Olathe, Kansas, and are open for public inspections.