The contract is for the installation of a new water main and shut-off valve at the Carbon Canyon Regional Park. The work includes providing all labor and materials to install a new 1" water main to the existing sinks, tying into the 2" POC, installing a gate valve at the main, and installing a gate valve at each sink. The contract amount is $8,325.00, and the time allotted for construction is 180 calendar days from the date of issuance of the Notice to Proceed. The contract includes provisions for payment, changes, termination, and dispute resolution. The contractor is required to comply with all applicable laws and regulations, including those related to prevailing wage rates, apprenticeship, and non-discrimination.
• The contract is governed by the laws of the State of California.
• The contractor is required to provide a Faithful Performance Bond and a Labor and Material Payment Bond.
• The contractor is required to comply with the provisions of Labor Code Sections 1771 et seq.
• The contract includes a cost reduction incentive provision, which allows the contractor to submit proposals for modifying the plans, specifications, or other requirements of the contract to reduce the total cost of construction.
• The contract includes a provision for the assignment of antitrust actions, which requires the contractor to assign to the County all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act or under the Cartwright Act.