Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›On-System Roadway Rehabilitation - Skyway

Awarded contract·Town of Paradise·California

On-System Roadway Rehabilitation - Skyway

Won by All Aman Construction$6.8MSingle Award
Contract source

Awarded vendors

  • All Aman Construction

Description

The contract is for the rehabilitation of the On-System Roadway on Skyway in Paradise, California. The work includes roadway excavation, asphalt concrete overlay, full depth reclamation paving, clearing and grubbing, removal and construction of concrete curbs, gutters, curb ramps, sidewalks, driveways, adjusting drainage facilities and utilities to grade, signing and striping, and other items of work as indicated on the project bid book and plans. The Engineer's Estimate for this contract is $6,790,000, and the project has 95 working days. The contract also has a Disadvantaged Business Enterprise (DBE) goal of 18%. • The contract is for roadway rehabilitation on Skyway in Paradise, California • The work includes various items such as excavation, paving, and construction of concrete curbs and gutters • The Engineer's Estimate is $6,790,000 • The project has 95 working days • The contract has a DBE goal of 18%

Attached files

Key dates

Duration
95 Working Days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
7303.1 CON

Contract value

$6,790,000

The Engineer's Estimate for this contract is $6,790,000. However, the bid results show that the lowest bid was $5,345,245.60 from All Aman Construction, and the highest bid was $6,328,583.00 from Teichert. Based on this information, the actual value of the contract is likely to be around $5-6 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Illinois Tollway·Illinois

Top match · 70%

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Raleigh Durham Airport Authority·North Carolina

69% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Illinois Tollway·Illinois

67% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

Little Rock Municipal Airport Commission·Arkansas

65% match

4R-22L RUNWAY AND TAXIWAY LIGHTING REHABILITATION

Closes 11/18/2026Opened 10/11/2026

Idaho Transportation Department·Idaho

65% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Toledo·Ohio

65% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

Port of Portland·Oregon

65% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

Port of Portland·Oregon

65% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Port of Portland·Oregon

65% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

City of Fort Wayne·Indiana

64% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of Vernon·California

64% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Mobile·Alabama

64% match

Critical Repair - 1523 Airview Dr. - Roof Replacement

Closes 11/10/2026Opened 10/28/2026

Georgia Savannah Airport Commission·Georgia

64% match

SAC 30639 Gulfstream Road and James Blackburn Drive Rehabilitation

Closes 11/10/2026Opened 10/5/2026

Illinois THA - Toll Highway Authority·Illinois

63% match

RR-26-2066 Jane Addams Meml Tlwy I-90 Rdwy and Bridge Rehab and Plaza Impr Rock Cut Pk Rd to Genoa R

Closes 12/3/2026Opened 10/22/2026

Illinois THA - Toll Highway Authority·Illinois

63% match

RR-26-2069 Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/28/2026

Municipality of Anchorage·Alaska

63% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

City of Boise·Idaho

63% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

City of Toledo·Ohio

63% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

U.S. Department Of Defense·Virginia

63% match

Repair Taxiway Pavements (Phase 3 and 4) Naval Air Station Oceana, Virginia

Closes 11/5/2026Opened 10/21/2026

Central Florida Tourism Oversight District·Florida

63% match

Traffic Management System Maintenance

Closes 11/24/2026Opened 10/30/2026

City of El Paso·Texas

63% match

Airway Aesthetics Maintenance

Closes 11/18/2026Opened 10/20/2026

Raleigh Durham Airport Authority·North Carolina

63% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

Massachusetts Department of Transportation·Massachusetts

63% match

610728 LEE FAP No. NHP(NHS)-003S(967)X Resurfacing and Related Work on Route 20

Closes 11/10/2026Opened 9/14/2026

City of Mobile·Alabama

63% match

Critical Repair - 2462 Pinetree Dr. - Roof Replacement

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Transportation·Wyoming

63% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026