Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Construction
  5. ›HVAC LOOP REPLACEMENT AT THALIAN HALL

Awarded contract·City of Wilmington·North Carolina

HVAC LOOP REPLACEMENT AT THALIAN HALL

Won by Schneider Electric Buildings Americas, Inc.$15kAwarded 4/3/2025Single Award
Contract source

Awarded vendors

  • Schneider Electric Buildings Americas, Inc.

Description

This contract calls for the complete removal and replacement of the heating and cooling water loops serving Thalian Hall, a historic municipal building in Wilmington, NC. The work includes installing new pipe runs from the mechanical room to six fan‑coil units, adding shut‑off valves, insulating and painting the piping, and providing proper labeling. The City requires full compliance with applicable codes, insurance, licensing, and minority‑business participation policies, and all bids were submitted via sealed invitation‑to‑bid. Schneider Electric Buildings Americas, Inc. was awarded the contract with a base bid of $14,280. • Scope: full HVAC loop demolition, new pipe installation, valve integration, insulation, painting, labeling. • Mandatory pre‑bid meeting on 2/17/2025; bid deadline 3/4/2025; award announced 4/3/2025. • Requires $1M CGL, $500K employer liability, workers’ comp, and any necessary local licenses.

Attached files

Key dates

Bids closed
3/4/2025
Intent to award
4/3/2025
Awarded
4/3/2025
Contract modified
2/26/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
238220
Solicitation №
PB-IH-0225.1

Contract value

$15,000

The awarded base bid recorded in the bid tabulation is $14,280, which reflects the contractor’s unit‑price estimate for the full loop replacement. Given the typical material costs for copper or steel pipe, insulation, valves, and labor for a project of roughly 420 linear feet per line, a realistic market‑rate estimate would fall between $12‑$18 per foot, yielding a total contract value in the $15,000‑$20,000 range. No additional alternates were exercised, so the final contract value is likely near $15,000. This estimate accounts for labor, materials, insurance, and overhead but excludes any potential change orders.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

NYS OGS Design & Construction - Construction Contractors·New York

Top match · 69%

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

The University of North Carolina·North Carolina

68% match

Jordan Hall HVAC Renovations

Closes 12/3/2026Opened 1/3/2025

NYS OGS Design & Construction - Construction Contractors·New York

67% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Connecticut Town of Brookfield·Connecticut

65% match

Library HVAC Replacement

Closes 11/12/2026Opened 10/8/2026

Department of Conservation and Recreation·Virginia

65% match

DCR - Falkland Lodge HVAC Equipment Replacement - Staunton River State Park

Closes 11/6/2026Opened 10/30/2026

Manhattan-Ogden Schools USD 383·Kansas

65% match

USD 383 Theodore Roosevelt and Bluemont HVAC Replacement

Closes 11/4/2026Opened 10/16/2026

North Carolina NC State University·North Carolina

64% match

NC State University

Closes 12/3/2026Opened 10/30/2026

Memphis-Shelby County Schools·Tennessee

64% match

RFP 110226JKG HVAC Replacements 5 Locations

Closes 11/2/2026Opened 10/2/2026

Virginia Tech·Virginia

64% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

North Carolina Central University·North Carolina

64% match

NC Central University

Closes 11/12/2026Opened 10/13/2026

Virginia Polytechnic Institute and State University·Virginia

64% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

Louisiana's Community and Technical College System·Louisiana

64% match

HVAC Rooftop Units / Chiller Replacement, Northshore Technical Community College, #085 / F.01004592

Closes 11/23/2026Opened 10/22/2026

Trident Technical College·South Carolina

64% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

Palm Beach County PBC·Florida

64% match

Supervisory of Elections HVAC Replacement Project

Closes 11/12/2026Opened 10/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Replace Heating HW Lines, Building 144, Admin, 145 Visitor Waiting & 146 Visitor – HVAC Work

Closes 11/18/2026Opened 9/30/2026

Kentucky Department of Corrections·Kentucky

64% match

RFB-106-27 DOC NTC Replace HVAC at Dormitories

Closes 11/17/2026Opened 10/22/2026

Board of Regents of the University System of Georgia·Georgia

64% match

GSU - RFQ Replace Terminal Units, Clarkston Building CH, Ground, 1st, and 2nd Floors

Closes 11/12/2026Opened 10/13/2026

City of Aurora, IL·Illinois

63% match

HVAC Equipment Replacement – Aurora RT25 Transportation Center

Closes 11/18/2026Opened 10/26/2026

Washington Enterprise Services (DES), Dept. of·Washington

63% match

SSC Auto HVAC Replacement

Closes 11/19/2026Opened 10/20/2026

City of Orangeburg·South Carolina

63% match

HVAC System Replacement for North Road Recreation Complex

Closes 11/6/2026Opened 10/6/2026

Connecticut Town of Brookfield·Connecticut

63% match

Library HVAC Replacement

Closes 11/12/2026Opened 10/8/2026

Northeastern Technical College·South Carolina

63% match

Replace Trane A/C Coil for 7.5-ton Unit

Closes 9/9/2027Opened 9/2/2026