This contract covers the design‑build construction of two new metal‑frame industrial structures at the McDuffie Terminal in Mobile, Alabama: a two‑story personnel assembly building and a large fabrication/shop building. The scope includes demolition of existing structures, installation of 3,068 LF of concrete bearing piles, structural steel erection, roof and wall systems, interior finishes, mechanical (HVAC, plumbing, fire‑sprinkler), electrical power and lighting, overhead bridge cranes, equipment lifts, and all site utilities and access controls. The contractor must also manage asbestos abatement, secure required performance and payment bonds, provide builder’s risk and flood insurance, and comply with a host of federal, state, and local codes (2021 IBC, ASHRAE 90.1, NFPA 13, HUD requirements, etc.). The award will be made to the lowest qualified bidder after a public opening on April 9 2026, with a contract period of 462 calendar days once a Notice to Proceed is issued.
• New construction of two pre‑engineered steel buildings (≈ 12,000 SF total).
• Full MEP installation, 7‑ton & 1‑ton crane equipment, and extensive site work including demolition, pile foundations, and utility coordination.
• Strict environmental and security requirements (asbestos handling, TWIC/APA badge access, flood insurance, performance bonds).