The contract is for the purchase of network switches, optics, and optical cables for the dark fiber project. The recommended hardware is needed to connect the new dark fiber network and establish a foundation for more resiliency in the district's internet service. The contract begins from the date of award through October 31, 2023, and the district anticipates the recommended core switches and related optics life cycle to be 8-10 years. The key features of the contract include the purchase of two core switches to provide each school site with connectivity to both the Administration Building data center as well as ITSC backup data center. The contract also includes the purchase of optics and optical cables. The district received RFP responses from three vendors and determined that Structured Communications was the most cost-effective and responsive meeting all technical requirements.
• The contract is for the purchase of network switches, optics, and optical cables.
• The contract begins from the date of award through October 31, 2023.
• The district anticipates the recommended core switches and related optics life cycle to be 8-10 years.
• The contract includes the purchase of two core switches and optics and optical cables.
• The district received RFP responses from three vendors and determined that Structured Communications was the most cost-effective and responsive meeting all technical requirements.