This contract is for minor home repairs at 3296 Lullaby Lane, Clinton, Ohio 44216. The scope of work includes installing wrought iron handrails on each side of the front stoop, removing the existing tub and installing a new shower with seat, and removing existing vinyl and installing new flooring. The contract requires the contractor to follow lead-safe renovation practices and comply with prevailing wage requirements. The contract was awarded to Optimal Solutions for a total of $6,900.00. Key points to consider when evaluating this contract include the specific scope of work, the requirements for lead-safe renovation practices, and the prevailing wage requirements.
• The contract requires the contractor to install wrought iron handrails on each side of the front stoop.
• The contract requires the contractor to remove the existing tub and install a new shower with seat.
• The contract requires the contractor to remove existing vinyl and install new flooring.
• The contract requires the contractor to follow lead-safe renovation practices.
• The contract requires the contractor to comply with prevailing wage requirements.