Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›23/0001 - Construction of Prefabricated Pedestrian Bridge…

Awarded contract·Harris County·Texas

23/0001 - Construction of Prefabricated Pedestrian Bridge Replacement for Harris County Precinct 1

Won by NBG Constructors, Inc.$447kSingle Award
Contract source

Awarded vendors

  • NBG Constructors, Inc.

Description

The contract is for the construction of a prefabricated pedestrian bridge replacement for Harris County Precinct 1. The project includes the removal of the existing timber bridge, rehabilitation of the existing trail, and installation of a new pedestrian bridge. The contract was awarded to NBG Constructors, Inc. on the basis of low bid, with a total price of $447,264. The contract term is from March 14, 2023, to March 13, 2024. The project is expected to ensure reliable and safe transportation for residents of Harris County. Key aspects of the project include: • Removal of the existing timber bridge • Rehabilitation of the existing trail • Installation of a new pedestrian bridge • Construction of a prefabricated pedestrian bridge • Removal of existing trail portion within 10'-0" of the proposed structure • Placement of bollards at the entrance to the proposed pedestrian bridge • SWPPP inspection and maintenance • Roadway excavation • Sodding for erosion control and stabilization • Concrete truck washout structures • Pre-fab steel bridge including wing walls, abutments, drill piers, and others.

Attached files

Key dates

Starts
3/14/2023
Ends
3/13/2024Renews
Duration
365 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
142817

Contract value

$447,264

The contract value is explicitly stated as $447,264, which is the total price for the construction of the prefabricated pedestrian bridge replacement. This value is based on the low bid submitted by NBG Constructors, Inc. and includes all the necessary work and materials for the project. The value is considered firm and fixed, as it is a lump sum contract.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

Top match · 76%

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

Carver County·Minnesota

76% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

BREC·Louisiana

75% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

75% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

CPPJ Road, Bridge, & Utility·Louisiana

75% match

West Parish Road Bridge Replacement Project

Closes 11/5/2026Opened 10/8/2026

Georgia City of Chattahoochee Hills·Georgia

74% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

Cobb County, GA·Georgia

74% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Caddo Parish Commission·Louisiana

74% match

26-17, Mira Myrtis Road Bridge Replacement Project

Closes 11/12/2026Opened 10/21/2026

Daviess County·Missouri

73% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

Missouri Department of Transportation·Missouri

73% match

Pulaski County, removal of the existing structure and construction of a new 98’-0” single span bridge with prestressed concrete NU-43 girders, etc.

Closes 11/30/2026Opened 10/30/2026

Lewis County·Washington

73% match

Davison Rd MP 0.01 Bridge Rehabilitation

Closes 11/19/2026Opened 10/29/2026

Georgia Cobb County Department of Transportation·Georgia

73% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Division of Highways·North Carolina

73% match

Replacement of Bridge 12 on State Road 1337, Cleveland County, NC

Closes 11/10/2026Opened 10/19/2026

City of Alexandria·Louisiana

73% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

Town of Westwood·Massachusetts

73% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Division of Highways·North Carolina

73% match

Replacement of Bridge 560098 (Purchase Order DM00407)

Closes 11/18/2026Opened 10/28/2026

Maryland State Highway Administration·Maryland

73% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

Texas Department of Transportation·Texas

73% match

STATE LET CONSTRUCTION CONTRACT, BURLESON CO, BRIDGE REPLACEMENT

Closes 11/3/2026Opened 10/7/2026

CPPJ Road, Bridge, & Utility·Louisiana

73% match

Garrie Cut‑Off Bridge Replacement Project – Calcasieu Parish Bridge Replacement

Closes 11/17/2026Opened 10/20/2026

Delaware River Joint Toll Bridge Commission·New Jersey

73% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Medina County - Engineering·Ohio

72% match

MED‑CR 50‑6.39 Chippewa Road Bridge #26 Replacement (PID 123604)

Closes 11/16/2026Opened 9/30/2026

City of Atlanta·Georgia

72% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Virginia Department of Transportation·Virginia

72% match

A98_2026 BRIDGE REPLACEMENT

Closes 11/18/2026Opened 9/9/2026