This solicitation requests a qualified consulting firm to update and perform a comprehensive Sewer User Charge Study for the Metropolitan District of Connecticut. The scope includes reviewing existing charge structures, developing a refreshed study methodology, conducting analyses, and delivering a final report with recommendations. Submissions must be made by the specified due date via USPS or UPS/FedEx to the District Clerk’s office.
• Purpose: Update the District’s sewer user‑charge framework and produce a detailed study report.
• Submission methods: Postal mail to the District Clerk or UPS/FedEx to the MDC headquarters.
• Key dates: Questions due 10/17/2017, bid due 11/3/2017, award announced 3/16/2018.
Attached files
The award documents live at the source — open the contract source above to download them.