The contract is for the replacement of pumps and associated piping, supports, and appurtenances at the Grange Pump Station. The work includes the installation of a pump lifting system, replacement of motor overload relay heaters, and installation of a temporary pump bypass pump connection. The contract was awarded to multiple vendors, with the lowest bid price being $173,600.00. The engineer's estimate for the project was $218,295. The contract document provides a detailed description of the work to be performed and the bid prices submitted by each vendor.
• Replacement of pumps and associated piping, supports, and appurtenances
• Installation of a pump lifting system
• Replacement of motor overload relay heaters
• Installation of a temporary pump bypass pump connection
• Multiple vendors were awarded the contract
• Lowest bid price was $173,600.00
• Engineer's estimate was $218,295