The Upper Dry Creek Interceptor Relief Project involves the installation of approximately 8,867 linear feet of 36-inch sanitary sewer gravity interceptor using open-cut construction methods, as well as other related work. The project requires the furnishing of all labor, materials, tools, and equipment. The contract includes mobilization/demobilization, dewatering and excavations, sheeting, shoring, and bracing of excavations, erosion and sediment control, cleaning, debris removal and disposal, traffic control, verification of pipe lengths and diameters, installation of pipelines, permitting compliance, site restoration, and additional items or details required by the Contract Documents.
• The project involves the installation of 36-inch sanitary sewer gravity interceptor using open-cut construction methods.
• The project includes the installation of 325 linear feet of 36-inch sanitary sewer gravity interceptor using trenchless construction methods.
• The project requires the installation of 325 linear feet of either 54-inch or 66-inch diameter steel casing.
• The project involves the installation of nineteen 60-inch diameter sanitary sewer manholes.
• The project includes the modification of an existing reinforced concrete diversion structure on Scotland Drive to connect to an existing SacSewer interceptor.
• The project requires the installation of a new reinforced concrete junction structure to connect the proposed sewer to an existing SacSewer interceptor.
• The project involves the rehabilitation of three 48-inch diameter CMP culverts, each approximately 50 linear feet (150 linear feet of repair total).
• The project includes the restoration of existing paved surface area of approximately 132,500 square feet.