This contract is for the repair of leaks in the Birch Conference Room, located at 415 W 6th St, Vancouver, WA 98660. The contractor, Pacific Federal Construction, LLC, will remove 24 ACM Panels and salvage 8 of those panels for reuse, fabricate 16 new ACM Panels, and provide and install a new Blueskin SA Air Barrier. The contract term is 90 working days from the notice to proceed, and the total contract value is $103,389.38 USD. The contract includes requirements for insurance, bonding, and prevailing wage rates. The City of Vancouver will pay the contractor in progress payments, with a retainage of 5%. The contract also includes provisions for dispute resolution, termination, and indemnification.
• The contract requires the contractor to remove 24 ACM Panels and salvage 8 of those panels for reuse.
• The contractor must fabricate 16 new ACM Panels from Citadel ACM Flat Sheets.
• The contractor must provide and install a new Blueskin SA Air Barrier along the entire 80 ft length of the South Overhang and Parapet Wall.
• The contract term is 90 working days from the notice to proceed.
• The total contract value is $103,389.38 USD.
• The contract includes requirements for insurance, bonding, and prevailing wage rates.