The contract is for the MVMS Parking Lot Rehabilitation in Cheyenne, Wyoming. The project involves the rehabilitation of the parking lot, with a base bid of $289,472.31 and two alternate bids for asphalt and concrete. The contract was awarded to STC Construction Co. The scope of work includes the reconstruction of the parking lot, with the contractor responsible for all necessary labor, materials, and equipment. The project is expected to be completed within a certain timeframe, although the exact duration is not specified. Key aspects of the contract include the requirement for a 10% bid bond, the submission of plans and specifications, and the mandatory pre-bid meeting.
• The contract requires a 10% bid bond, which must be submitted with the bid.
• The contractor must submit plans and specifications for the project, which will be reviewed and approved by the agency.
• A mandatory pre-bid meeting was held on December 29, 2016, at 10:00 a.m., which all bidders were required to attend.
• The contract includes two alternate bids for asphalt and concrete, which will be considered separately from the base bid.
• The contractor will be responsible for all necessary labor, materials, and equipment to complete the project.