The contract is for the construction of skyway safety improvements from Chico City Limits to Paradise Town Limits. The work includes implementation of construction traffic control measures, application of a pavement milling and overlay process, and installation of new thermoplastic traffic striping and pavement markings. The contract was awarded to Knife River Construction and George Reed, Inc. The engineer's estimate for the project is $1,544,771.45. The contract includes various items such as clearing and grubbing, traffic control, and pavement cold plane. The project is located in Butte County, California.
• The project includes milling of the existing 0.08 Ft. of open grade friction course and replacing with 0.17 Ft. of polymer modified hot mix asphalt.
• The project includes thermoplastic striping, raised and inverted profiled thermoplastic striping, thermoplastic marking, pavement markers, and solar powered driver feedback signs.
• The contract was advertised on June 23, 2014, and bids were opened on July 17, 2014.
• The project is expected to be completed within a certain duration, although the exact duration is not specified.