The contract is for the construction of fabric canopies in the existing FAA Parking lot at Tampa International Airport. The work includes providing labor, materials, and equipment in accordance with the contract documents and specifications. The contract has a total value of $899,992.64 and is expected to be completed within 245 days. The contractor, Johnson-Laux Construction, LLC, will be responsible for performing the work, including demolition, excavation, concrete footers, and installation of the canopies. Some key aspects of the contract include:
* The contractor will provide engineered shop drawings developed by Shade Systems.
* The contractor will be responsible for temporary latex striping, which will be replaced with thermoplastic striping after a 14-day cure period.
* The contractor will provide a dumpster for construction waste.
* The contract includes allowances for owner's allowance, site restoration, building permit fees, and bond fees.
The main goal of this project is to provide new fabric canopies in the existing FAA Parking lot, which will enhance the overall appearance and functionality of the area.