Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›MATHER DAM IMPROVEMENT PROJECT

Awarded contract·County of Sacramento - Department of Water Resources·California

MATHER DAM IMPROVEMENT PROJECT

Won by Contractor Services Group, Inc.$2.4MSingle Award
Contract source

Awarded vendors

  • Contractor Services Group, Inc.

Description

The Mather Dam Improvement Project involves the removal and replacement of the existing spillway structure with a new spillway structure and bridge, improvement of the spillway approach and exit channel, excavation of an upstream bench, and installation of a downstream buttress embankment improvement to the main dam. The project also includes the raising of the wing dam. The estimated construction cost is $2,286,000, and the required contractor license is a Class A General Engineering Contractor. The bid was submitted by Contractor Services Group, Inc. with a total bid amount of $2,417,091. • The project requires the removal and replacement of the existing spillway structure • The project includes the improvement of the spillway approach and exit channel • The project requires the excavation of an upstream bench and installation of a downstream buttress embankment improvement to the main dam • The project includes the raising of the wing dam • The estimated construction cost is $2,286,000 • The required contractor license is a Class A General Engineering Contractor

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
4363

Contract value

$2,417,091

Based on the bid document, the total bid amount is $2,417,091. This amount includes the base bid and the alternative bids. The estimated construction cost is $2,286,000, which is close to the total bid amount. Therefore, the estimated value of the contract is around $2,286,000 to $2,417,091.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Columbus Ohio·Ohio

Top match · 68%

Hoover Dam Improvements – Part 2

Closes 12/9/2026Opened 10/14/2026

Ohio Department of Natural Resources·Ohio

67% match

Cowan Lake Dam Improvements

Closes 11/6/2026Opened 10/2/2026

Gwinnett County Government·Georgia

67% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Massachusetts Town of Bolton·Massachusetts

67% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

City of Columbus·Ohio

67% match

Hoover Dam Improvements Pt. 2

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of Defense·California

66% match

Mather Fueling System Repairs

Closes 11/20/2026Opened 10/22/2026

Ohio Department of Natural Resources·Ohio

66% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

Inland Empire Utilities Agency·California

66% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

U.S. Department Of Defense·Kentucky

65% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Lower Platte North Natural Resources District·Nebraska

65% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITES 55 AND 84

Closes 12/2/2026Opened 9/17/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

65% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

Lower Platte North Natural Resources District·Nebraska

65% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026

State of Michigan – Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division·Michigan

65% match

751/26612.MAA; Various Dams - Engineering Studies

Closes 12/3/2026Opened 10/22/2026

North Central Missouri Regional Water Commission·Missouri

65% match

REBID NCMRWC Roy Blunt Multi-Purpose Reservoir

Closes 11/5/2026Opened 10/15/2026

The City of Columbus·Ohio

65% match

RFQ033855 - Hoover Dam Improvements Pt. 2

Closes 12/9/2026Opened 10/16/2026

City of Santa Rosa·California

65% match

Bennett Valley Golf Course Irrigation System Improvements

Closes 11/5/2026Opened 10/6/2026

City of South Lake Tahoe·California

65% match

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

Washakie County Conservation District·Wyoming

65% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

U.S. Department Of Transportation·Washington

65% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

U.S. Department Of Transportation·Montana

65% match

MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project

Closes 7/27/2028Opened 7/27/2026

U.S. Department Of The Interior·Nevada

65% match

Y--BASSIE SPRING IMPROVEMENT PROJECT

Closes 11/9/2026Opened 9/25/2026

City of Charlotte·North Carolina

64% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

U.S. Department Of Defense·Texas

64% match

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

California Grants·California

64% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

U.S. Department Of Veterans Affairs·California

64% match

Y1LB--FY27 NRM - Correct Mather Loop Road and Install Speed Bumps

Closes 11/2/2026Opened 10/26/2026