Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›FLORIN CREEK MULTI-USE BASIN PROJECT

Awarded contract·County of Sacramento - Construction·California

FLORIN CREEK MULTI-USE BASIN PROJECT

Won by DeSilva Gates$3.7MSingle Award
Contract source

Awarded vendors

  • DeSilva Gates

Description

The contract is for the construction of a multi-use detention basin, including the excavation of approximately 65,000 cubic yards of soil, and the construction of park enhancements, such as a pond, drainage and roadway construction, pedestrian bridge relocation, wetland habitat construction, and the modification, installation, or relocation of utilities. The contract was awarded to DeSilva Gates with a bid of $3,660,660.00. The project is located in Sacramento, California, and the contract is being managed by the County of Sacramento's Construction Management & Inspection division. • The project includes the construction of a multi-use detention basin • The project includes the excavation of approximately 65,000 cubic yards of soil • The project includes the construction of park enhancements, such as a pond, drainage and roadway construction, pedestrian bridge relocation, wetland habitat construction, and the modification, installation, or relocation of utilities • The contract was awarded to DeSilva Gates with a bid of $3,660,660.00 • The project is located in Sacramento, California • The contract is being managed by the County of Sacramento's Construction Management & Inspection division

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
4297

Contract value

$3,660,660

The contract value is estimated to be $3,660,660.00, based on the bid amount submitted by DeSilva Gates. This estimate is based on the assumption that the contract will be awarded for the full amount of the bid, and that there will be no changes or modifications to the contract that would affect the total value. Factors that could influence the contract value include changes to the scope of work, modifications to the contract terms, or unforeseen site conditions that could impact the construction costs.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·Louisiana

Top match · 65%

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

Texas City of Waco·Texas

64% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Waco·Texas

64% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Charlotte·North Carolina

64% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

California Grants·California

63% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

City of Charlotte·North Carolina

63% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

City of Harrisonburg·Virginia

63% match

Water Treatment Plant Sedimentation Basin Plate Settlers Project RFP (2027004-PU-DB)

Closes 12/10/2026Opened 10/6/2026

U.S. Department Of Defense·Illinois

63% match

FLOSSMOOR ROAD VIADUCT STORM SEWER IMPROVEMENTS, FLOSSMOOR, COOK COUNTY, ILLINOIS

Closes 10/15/2035Opened 10/15/2025

City of Dubuque·Iowa

63% match

North Fork Catfish Creek Multi-Site Design Services

Closes 11/6/2026Opened 10/9/2026

Clean River Partners·Minnesota

63% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

NYS Cambria, Town of·New York

63% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Citrus County - Board of County Commissioners·Florida

63% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

Inland Empire Utilities Agency·California

63% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

West County Wastewater·California

62% match

Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2)

Closes 12/16/2026Opened 10/27/2026

City of Austin·Texas

62% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

East Bay Municipal Utility District·California

62% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

California Grants·California

62% match

Proposition 68 Rivers and Streams Grant Program – Klamath-Trinity Watershed

Rolling / TBD closeOpened 6/17/2025

Laramie Rivers Conservation District·Wyoming

62% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

City of Charlotte·North Carolina

62% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Waco·Texas

62% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

Sarasota County·Florida

62% match

Physical Map Revision for Little Sarasota Bay, Lemon Bay, and Phillippi Creek Watersheds

Closes 11/19/2026Opened 10/21/2026

California Grants·California

62% match

Proposition 1 Lower Los Angeles River Grants

Rolling / TBD closeOpened 1/27/2025

Washakie County Conservation District·Wyoming

62% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

62% match

Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA

Closes 6/12/2028Opened 5/28/2026

U.S. Bureau of Reclamation·United States of America

62% match

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026