The Bear Valley Road Bus Stop Relocation Project involves the rehabilitation of existing roadways, including cold milling of existing asphalt concrete pavement, removal of existing base course paving and/or subgrade, construction of asphalt concrete pavement, concrete curb, concrete curb and gutter, concrete sidewalk, concrete pavement, and concrete driveways. The project is funded in whole or in part with Article 3 Transportation Development Act Funds. The engineer's estimate for the project is $140,000.
• The project includes mobilization and demobilization, erosion control and pollution prevention, traffic control and safety, surveying and staking, and adjustment of existing manhole covers to grade.
• The project also includes the construction of 6-inch asphalt concrete pavement and the removal of existing asphalt concrete berm and/or subgrade.
• The bid results section lists several contractors with their base bid amounts, with TIS, INC. having the lowest bid of $119,451.00.