The contract is for the Cypress Creek Weir Wetland Restoration project, which aims to improve the hydro-period of the wetlands and uplands in the Cypress Creek watersheds. The work includes installing a sheet pile weir, re-establishing freshwater flows, and reducing erosion. The contract was awarded on June 19, 2018, with a total bid of $542,629.80. The key aspects of the contract include:
• Wetland restoration
• Installation of a sheet pile weir
• Re-establishment of freshwater flows
• Reduction of erosion
• Associated site work, including clearing, grubbing, and stripping of existing canal banks, temporary cofferdams, dewatering, and installation of a concrete cap.