The contract is for the replacement of a septic system at 2949 Wadsworth Rd, Norton, Ohio 44203. The project requires the installation of an NPDES compliant aerobic treatment unit, and the contractor must provide all necessary permits and inspections. The contract also includes the connection of downspouts and the crushing and filling of the existing septic system. The contractor must have a current registration, bond, and insurance on file with the appropriate jurisdictions. The contract is subject to Davis Bacon wage rates.
• The project requires the installation of an NPDES compliant aerobic treatment unit
• The contractor must provide all necessary permits and inspections
• The contract includes the connection of downspouts and the crushing and filling of the existing septic system
• The contractor must have a current registration, bond, and insurance on file with the appropriate jurisdictions
• The contract is subject to Davis Bacon wage rates