The City of Prescott is undertaking a municipal‑level civil construction project to repair and reconstruct a segment of Pleasant Street, including pavement resurfacing, curb‑and‑gutter replacement, storm‑drain upgrades, and utility adjustments. The scope covers removal of existing pavement and concrete, over‑excavation, installation of Tensar geogrid, placement of a new aggregate base course, 4‑inch asphalt concrete paving, new catch basins, and associated traffic‑control and erosion‑control measures. The contract was awarded to Asphalt Paving & Supply, Inc. after a competitive bid process that closed on July 24 2025, with the city’s council formally awarding the contract on August 26 2025. Work is to commence after the Notice to Proceed (week of September 22 2025) and must be completed within 120 calendar days. Key points include:
• Comprehensive roadway and drainage rehabilitation (pavement, curb, gutter, catch basins, storm‑pipe).
• Mandatory compliance with MAG specifications, SWPPP, and utility‑locate requirements.
• Unit‑price / actual‑quantity payment basis, with a 10 % bid guarantee and full‑value performance bonds.