This contract is for the construction of a portion of the Schuylkill River Trail along College Drive and Industrial Highway in Pottstown Borough. The project includes the furnishing of all labor, supervision, equipment, and materials for the construction of approximately 6000 feet of shared use path within or about the existing roadway section along Industrial Highway between Washington Street and Moser Road. The contract was awarded to Flyway Excavating, Inc. The contract duration is 370 calendar days. Some key items of work include clearing and grubbing, class 1 excavation, subbase, asphalt mixture design, and guide rail installation.
• Clearing and grubbing (includes removal of existing curb)
• Class 1 excavation
• Subbase 5" depth (No. 2A)
• Superpave asphalt mixture design
• Guide rail installation
• Signing and pavement markings