Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Architecture
  5. ›Applied Research Laboratory Replacement Building

Awarded contract·Pennsylvania State University-Main Campus·Pennsylvania

Applied Research Laboratory Replacement Building

Won by CallisonRTKL$2MAwarded 6/9/2020Single Award
Contract source

Awarded vendors

  • CallisonRTKL

Description

The Pennsylvania State University selected CallisonRTKL to provide full architect‑engineer services for the new Applied Research Laboratory (ARL) Replacement Building on the Science Park campus. The scope includes master‑planning, space‑utilization analysis, program development, schematic and design‑development, construction documents, and construction administration, with special emphasis on secure research facilities, NISPOM/ICD‑705 compliance, and LEED certification. The selection process followed a standard qualification‑based A/E team selection: a Request for Letters of Interest, a long‑list RFP, short‑list interviews, and final award in June 2020. The project’s total cost is $50.8 million, with construction estimated at $31 million; the design services fee is expected to be a small fraction of that total. • Master‑plan and multi‑phase campus strategy for the ARL Science Park. • Full design‑build support (architectural, structural, MEP, civil, sustainability) integrated with a Construction Manager at Risk. • Mandatory security clearances and LEED performance standards for a high‑performance research facility.

Attached files

Key dates

Bids closed
4/4/2024
Intent to award
6/9/2020
Awarded
6/9/2020
Starts
6/9/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310

Contract value

$2,000,000

The RFP documents disclose a total project cost of $50.8 million, of which roughly $31 million is for construction and $6.2 million for FF&E. Architect‑engineer design fees for a project of this size typically range from 3 % to 7 % of construction cost, depending on scope and complexity. Applying a mid‑range 5 % fee to the $31 million construction budget yields an estimated design contract value of about $1.55 million. Considering additional master‑planning, security compliance, and LELE‑related services, a reasonable ball‑park estimate for the awarded design contract is between $1.5 million and $2.5 million. A median figure of $2 million is therefore used as the estimate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

The University of North Carolina·North Carolina

Top match · 66%

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

U.S. Department Of Energy·New Jersey

66% match

RF Roof Replacement Project

Closes 12/10/2026Opened 10/30/2026

U.S. Department Of Defense·New York

66% match

Renovate Suite H8, Building 3

Closes 11/2/2026Opened 10/2/2026

U.S. General Services Administration·Maryland

65% match

FDA Lab Renovation in Silver Spring, MD

Closes 11/5/2026Opened 10/14/2026

The University of Iowa·Iowa

64% match

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/21/2026

Northern Virginia Community College·Virginia

63% match

260-B5260-007 CM Engineering Lab & Pantry

Closes 11/9/2026Opened 10/6/2026

U.S. Department Of Veterans Affairs·Washington

63% match

5650--American Lake B81 Lab Roof

Closes 11/1/2026Opened 9/2/2026

Texas A&M University System·Texas

63% match

AE RFQ - West Campus Vivarium - College Station, Texas

Closes 11/10/2026Opened 10/13/2026

U.S. Department Of Energy·Illinois

63% match

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Closes 12/17/2026Opened 10/6/2026

Georgia Augusta University·Georgia

63% match

Interdisciplinary Research Building Replacement of the Fire Alarm System

Closes 12/3/2026Opened 8/25/2026

University of Iowa Facilities Management·Iowa

63% match

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/22/2026

Shawnee State University·Ohio

62% match

Shawnee State University Technology Innovation Lab Project Rebid ADDENDUM #1

Closes 11/4/2026Opened 10/28/2026

University of Louisville·Kentucky

62% match

Fresh Tissue Lab Renovation | CM/GC

Closes 11/3/2026Opened 10/9/2026

Los Angeles County Public Works·California

62% match

Removal of existing meter pit and office structure and replacement with prefabricated office and ADA‑compliant restroom building

Closes 11/24/2026Opened 10/26/2026

University of Wyoming·Wyoming

62% match

Agriculture Building Lysimeter Chamber Decommissioning

Closes 11/20/2026Opened 10/26/2026

Northeastern Illinois University·Illinois

62% match

Invitation for Construction Bid: Integrated Bioprocessing Research Laboratory Add

Closes 11/4/2026Opened 10/1/2026

U.S. Department Of Veterans Affairs·Washington

62% match

5650--American Lake B81 Lab Roof

Closes 11/1/2026Opened 9/2/2026

York Technical College·South Carolina

62% match

YTC - Welding Expansion - Building D **READVERTISEMENT - Documents May Be Obtained From Location**

Closes 11/12/2026Opened 10/14/2026

Connecticut City of Bristol·Connecticut

61% match

Architectural Services for Food Science Lab Improvements

Closes 11/19/2026Opened 10/30/2026

U.S. Department Of Defense·Ohio

61% match

Experiments, Prototypes, Research, and Evaluation Supporting Systems (EXPRESS)

Closes 2/14/2027Opened 6/1/2022