The contract is for the Emerald Necklace Marina Dredging project, covering years 2019, 2020, and 2021. The estimated cost for each year is $64,500, $65,500, and $66,500 respectively. The contract was awarded to Geo Grade and Huffman Equip. The scope of work includes dredging services for the marina. Key points to consider are the contract duration, estimated costs, and the services provided.
• The contract covers a period of three years.
• The estimated costs for each year are $64,500, $65,500, and $66,500.
• The services provided include dredging for the marina.
• The contract was awarded to two vendors, Geo Grade and Huffman Equip.