Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›Bloomfield Transmission Water Main Extension-Phase II

Awarded contract·The Metropolitan District·Connecticut

Bloomfield Transmission Water Main Extension-Phase II

$3.5MAwarded 7/12/2019Single Award
Contract source

Description

This contract concerns the replacement of approximately 4,000 feet of 30‑inch ductile‑iron water main in the Town of Bloomfield, CT. The scope includes all labor, equipment, permits, and related accessories required to install the new water main, as defined in Section 01010 “Summary of Work.” The project is to be executed by a qualified contractor holding a current DAS Contractor Pre‑qualification Certificate for Sitework, with additional pre‑qualification requirements for any subcontractors whose portion exceeds $500,000. A mandatory pre‑bid conference was held on May 7 2019, and bids were due by May 30 2019. The Metropolitan District will award the contract based on sealed bids, with a bid security equal to 10 % of the bid amount. • Replacement of 4,000 ft of 30‑inch ductile‑iron water main in Bloomfield, CT. • All labor, equipment, permits, and accessories included; DAS pre‑qualification required for prime and major subcontractors. • Mandatory pre‑bid conference (May 7 2019) and bid deadline (May 30 2019); award announced July 12 2019.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
5/30/2019
Intent to award
7/12/2019
Awarded
7/12/2019

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
2019B-03

Contract value

$3,500,000

The contract involves 4,000 ft of 30‑inch ductile‑iron pipe. Industry estimates for full installation of large‑diameter ductile‑iron water mains range from $750 to $1,000 per foot when material, excavation, back‑filling, and testing are included. Using a midpoint of $875 per foot yields an approximate total of 4,000 ft × $875 = $3,500,000. Additional costs for project management, permits, and contingency could push the total toward $4 million. Therefore, a reasonable ball‑park estimate for the contract value is between $3.5 million and $4 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Public Water Supply District No. 2 of St. Charles County·Missouri

Top match · 71%

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Town of Eatonville·Florida

71% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Hastings Utilities·Nebraska

70% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Massachusetts Town of Westborough·Massachusetts

70% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

County of Frederick, MD·Maryland

70% match

Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/9/2026

Catawba Regional Council of Governments·South Carolina

70% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Florida Governmental Utility Authority·Florida

69% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

City of Charlotte·North Carolina

69% match

Fiscal Year 2026 Street Main Extensions Contract 1

Rolling / TBD closeOpened 1/15/2026

NYS Greenburgh, Town of·New York

69% match

Lead Service Lines Identification Project - Phase I

Closes 12/1/2026Opened 10/28/2026

City of Charlotte·North Carolina

69% match

Fiscal Year 2026 Street Main Extensions Contract 2

Rolling / TBD closeOpened 1/15/2026

Goodwyn Mills Cawood·Georgia

68% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Hastings Public Works / Utilities·Nebraska

68% match

Lakeview 11th Water & SS Extension Dist 2026-1 HU 2026-77

Rolling / TBD closeOpened 7/21/2026

City of Bellevue·Washington

68% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Ontario·California

68% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Clermont County - Board of Commissioners·Ohio

68% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

City of Litchfield·Illinois

68% match

Water Distribution Improvements Phases 1 & 2 - Litchfield, IL

Closes 11/5/2026Opened 10/2/2026

Lansing Board of Water & Light·Michigan

68% match

Surveying, Drafting, and Design Services for the Installation of Water Main at Multiple Locations (Dunlap, Astor, Berry, Palmer, Tenny

Closes 11/24/2026Opened 10/23/2026

Maryland Frederick County Government·Maryland

68% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026

Bristol Virginia Utilities Authority·Virginia

68% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

Georgia Rockdale County Board of Commissioners·Georgia

68% match

Water Main Extensions

Closes 12/3/2026Opened 10/26/2026

Western Virginia Water Authority·Virginia

67% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of Grand Rapids Department of Engineering·Michigan

67% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

U.P. Engineers & Architects, Inc·Michigan

67% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

Butler County·Ohio

67% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

City of Hattiesburg·Mississippi

67% match

12238 North Main Street Area Infrastructure Improvements - Phase 1 #21158

Closes 11/19/2026Opened 10/16/2026