The City of Palm Bay, Florida, has awarded a contract for the construction of a stormwater treatment train in the High-Tech Corridor. The project involves the installation of catch basin inlets, piping, gross debris baskets, and a modified slot to hold a Polyacrylamide (PAM) Log. The treatment train will also include the installation of Third Generation baffle box SkimBoss filtration boxes. The contractor, JoBear Contracting, Inc., will be responsible for furnishing and installing all items identified on the construction plans. The estimated annual value of the contract is $381,635.15.
• The project is a turn-key construction project.
• The contractor will be responsible for mobilization, demobilization, erosion control, dewatering, maintenance of traffic, sign removal, utility conflict coordination, pavement restoration, as-built, and final restoration.
• The project will be constructed in two locations, as shown on plan areas B and C.
• The treatment train will end with the installation of additional Third Generation baffle box SkimBoss filtration boxes with bold and gold media on the upland side of the watershed outfalls to Turkey Creek.