The contract is for the installation of Identiv access control devices at 901 and 906 G Street. The work includes the furnishing of all labor, materials, equipment, transportation, and services necessary to install access control devices for 22 doors and 1 safe, request to exit sensors for 17 doors, programmable lock down buttons for 4 doors, and door release buttons at 5 locations. The estimated construction cost is $75,000. The contract was awarded to Secure Com Inc. with a bid of $75,864.00.
• The contract includes the installation of access control devices for 22 doors and 1 safe.
• The contract includes the installation of request to exit sensors for 17 doors.
• The contract includes the installation of programmable lock down buttons for 4 doors.
• The contract includes the installation of door release buttons at 5 locations.
• The estimated construction cost is $75,000.
• The contract was awarded to Secure Com Inc. with a bid of $75,864.00.