Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›5/8", 1", 1.5" & 2" Potable Water Meter Change Outs

Awarded contract·City of Fort Myers·Florida

5/8", 1", 1.5" & 2" Potable Water Meter Change Outs

$300kSingle Award
Contract source

Description

The City of Fort Myers is soliciting bids for the replacement of 5/8", 1", 1.5", and 2" potable water meters. The contract is for the provision of plumbing equipment, accessories, and supplies, including water meters, meter fittings, and meter reading devices. The scope of work includes the change-out of existing meters with new ones. The contract is open to all qualified bidders. Key aspects of the contract include the type and size of meters to be replaced, the materials and equipment to be used, and the timeline for completion. • The contract is for the replacement of potable water meters of various sizes. • The scope of work includes the provision of plumbing equipment and accessories. • The contract is open to all qualified bidders. • The City of Fort Myers is seeking a contractor to perform the meter change-outs. • The contract duration and value are not specified in the document.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
23822
Solicitation №
ITB 0060-24

Contract value

$300,000

The contract value is not explicitly stated in the document. However, based on the scope of work, which involves the replacement of potable water meters of various sizes, the contract value could be estimated to be in the range of $100,000 to $500,000. This estimate is rough and based on the assumption that the contract will involve a significant number of meter replacements. The actual value could be higher or lower, depending on the specific requirements of the contract and the number of meters to be replaced. Factors that may influence the contract value include the type and quantity of meters to be replaced, the materials and equipment required, and the timeline for completion.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 68%

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Georgia Jones County Board of Commissioners·Georgia

65% match

Water Meter Change Out-2026

Closes 11/5/2026Opened 9/28/2026

City of Bedford, TX·Texas

64% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

Connecticut Metropolitan District Commission·Connecticut

63% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

City of Seattle·Washington

63% match

Small Single & Multi-Jet Cold Water Meters

Closes 11/18/2026Opened 9/30/2026

Little Blue NRD·Nebraska

63% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

City of Phoenix·Arizona

63% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

LA County Internal Services Department·California

62% match

WATER METERS HIGH PRESSURE 3 YEAR AGREEMENT

Closes 11/18/2026Opened 10/28/2026

City of Holly Grove·Arkansas

62% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

The Metropolitan District·Connecticut

62% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

The Ohio State University·Ohio

62% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

Rural Community Water District of Georgetown County·South Carolina

62% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

Massachusetts Town of Kingston·Massachusetts

62% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Washington Suburban Sanitary Commission, MD·Maryland

62% match

Furnish and Deliver Small and Large Water Meters

Closes 11/2/2026Opened 9/21/2026

City of Boca Raton·Florida

61% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Hilton Head Public Service District·South Carolina

61% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

City of Boca Raton·Florida

61% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Arlington County Government·Virginia

61% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Folsom·California

60% match

CITY OF FOLSOM: VARIOUS WATER METER PROCUREMENT CONTRACTS

Closes 11/13/2026Opened 9/24/2026

LA Water & Power·California

60% match

146747 5/8"-1", Meter, Cold Water, Positive Displacement

Closes 11/12/2026Opened 10/29/2026

City of Gould·Arkansas

60% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

Georgia City of Oxford·Georgia

60% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

Massachusetts Peabody Municipal Light Plant·Massachusetts

60% match

Meter Exchange Services

Closes 11/30/2026Opened 10/26/2026

City of Winnebago·Minnesota

60% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

Town of Lexington·South Carolina

60% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026