This contract covers the complete replacement of the North State Street water main, including mobilization, traffic management, erosion control, surveying, installation of various diameters of DR‑18 PVC pipe, gate valves, water service lines, meters, meter pits, fire hydrant work, and abandonment of existing mains with flowable fill. A‑Del Construction was awarded the main scope (approximately $2.74 M), while Reybold Construction received a separate contingency scope for sewer‑lateral removal/replacement (approximately $0.33 M). The project totals roughly $3.08 M and is located in Newark/Bear, Delaware.
• Primary scope: PVC water‑main installation (12”‑6”) and associated hardware.
• Additional work: fire‑hydrant removal/installation and sewer‑lateral contingency.
• Awarded to two vendors, with A‑Del Construction handling the bulk of the work.