The City of Bellevue (WA) is seeking bids for the 164th Ave NE LID Retrofit project. The project involves grub and clear existing grass lined swale/plant areas, excavate and regrade existing grass lined swales, remove storm drain structures and obstructions, and install storm drainage modifications. The bid also includes the installation of bioretention soil, topsoil, compost, planting, and drip irrigation. The project requires property restoration and miscellaneous work. The bid documents include specifications, plans, and addendums. The bid price for Northwest Cascade, Inc is $675,509.88, for Kamins Construction, Inc is $523,014.80, for McCann Construction Enterprises, Inc is $614,276.00, and for New X, Inc is $593,409.28.
• The project involves multiple tasks such as grub and clear existing grass lined swale/plant areas, excavate and regrade existing grass lined swales, and remove storm drain structures and obstructions.
• The bid includes the installation of bioretention soil, topsoil, compost, planting, and drip irrigation.
• The project requires property restoration and miscellaneous work.
• The bid documents include specifications, plans, and addendums.
• The bid price for each vendor is provided in the bid tabulation.